Jedlik Ányos Energy Grant Package Prices
For small businesses with 50% funding support
50 kW rooftop-installed HMKE solar PV system
With 100 kWh industrial energy storage
Net package price: 23,800,000 HUF
Net package price: 11,900,000 HUF (with 50% subsidy)
- HMKE solar system capacity: 50.020 kWp
- Energy storage capacity: 100 kWh (BF100)
- Connection type: DC-coupled
- Hybrid inverter: Solis S6-EH3P50K-H
- Expected annual production: 55,300 kWh
- Annual savings (at 70 HUF): 3,871,000 HUF
- Payback period with 50% subsidy: 2.58 years
- TIER1 410 Wp JA Solar panels: 122 pcs
- HMKE design and permitting: Yes
- Required roof area: 295 m²
- Inverter warranty: 5 years
- Storage warranty: 5 years
- Solar panel warranty: 10 & 25-year performance warranty
- Grant application management: Yes
- The package includes HMKE design and permitting.
- It does not include meter cabinet standardization, capacity increase, or additional electrical work.
- The price applies to at least 295 m² of continuous trapezoidal metal roofing with a minimum slope of 5 degrees.
- For tiled, flat, or segmented roofs, a custom price applies.
- Electrical connection is within 15 meters.The payback calculation is for informational purposes only, and the projections used are not legally binding
Installation alongside an existing solar PV system
Installation of a 100 kWh / 232 kWh (2h) industrial energy storage unit
Net package price: 23,800,000 HUF
Net package price: 11,900,000 HUF (with 50% subsidy)
- Energy storage capacity: 100 kW / 232 kWh (2h)
- Energy storage type: Dyness DH200Y
- Connection type: AC-coupled
- Battery type: LFP (LiFePO₄)
- Cooling method: Liquid cooling
- Weight: 2500 kg
- Dimensions: 1040×1500×2200 mm
- 200 kW solar power plant
- Unused energy annually: 48,500 kWh
- Annual savings (at 70 HUF): 3,395,000 HUF
- Payback period with 50% subsidy: 2.95 years
- Design and permitting: Yes
- Storage warranty: 5 years
- Grant application management: Yes
- The package includes turnkey industrial energy storage design, permitting, and installation.
- It includes a collector AC cabinet for the energy storage unit.
- The electrical connection distance between the energy storage AC cabinet and the grid connection point is 10 meters (additional electrical work is not included).
- The payback calculation is for informational purposes only, and the projections used are not legally binding.
Get in Touch with Us!
If you would like to have your own energy storage system, simply fill out the form to contact us!
We are here to support you every step of the way!